In a recent high-density residential project, our team faced significant challenges integrating MEP services within the BIM framework. Initially, clashes between plumbing and electrical systems were frequent, causing delays. By fostering early and continuous collaboration among all stakeholders and utilizing clash detection tools, we were able to identify and resolve conflicts before construction began. This approach not only minimized disruptions but also optimized space utilization. The result was a streamlined construction process with efficient use of space and resources. How have you successfully tackled similar challenges in your projects?