Modular Toilet Cubicle Packs by Cubicle Store

  • Cubicle Store - Modular toilet cubicle packs available at Trade Washrooms

Why wait several weeks for the manufacture and delivery of toilet cubicles? Trade Washrooms has teamed up with Cubicle Store to supply a range of modular toilet cubicle packs available from stock and delivered within 3 – 5 working days.

Ordering toilet cubicles with Trade Washrooms couldn’t be easier. For every cubicle opening, you need a Toilet Cubicle Door Pack, and for every dividing partition, you need a Toilet Cubicle Partition Pack. Simple.

To complete your washroom, matching IPS panel packs help to conceal pipework and cisterns, and with the latest addition to the range, the Vanity Unit Panel Pack, you can create a one, two or three-basin unit.

The full range is available to purchase online now at tradewashrooms.co.uk

Community comments

Latest Sponsored News

Ultimate Guide to Getting Your Product Specified in More Projects

Posted 21.11.2024

Getting Your Product Specified in More Projects

We have developed the 'Ultimate Guide to Getting Your Products Specified in More Projects' to provide you with an in-depth understanding of how BIM can unlock product sales and win your more customers. The guide offers insight to BIM and the link to project specification, BIM for business growth, success studies from the industry and a glimpse at the future of BIM.

SuDs – What Schedule 3 Means for You

Posted 19.11.2024

Forterra SuDs Schedule 3

SuDs (Sustainable Drainage Systems) are about to become mandatory in England with the enactment of Schedule 3 of the Flood and Water Management Act 2010. But what does this mean for your next development? In this blog Forterra explains what you need to consider.

Ibstock Are More Than Ready To Play a Leading Role in the Recovery of Building

Posted 14.11.2024

Ibstock Interview with CEO Joe Hudson

With more focus than ever on housebuilding, the team at Ibstock recently had the opportunity of speaking with their CEO, Joe Hudson to discuss how Ibstock are more than ready to play a leading role in the recovery of building.

CloseClose