bott provide the perfect modular solution for Multimatic Niche Vehicle Assembly Europe

In the course of their long-standing partnership with Multimatic Motorsports, bott have provided many high-performing workspaces for the company’s specialist facilities in the UK.

Ranging from large-scale, bespoke workshop installations, to workplace storage solutions for pit garages and race support vehicles.
 


Most recently, bott have installed a flexible, modular system for Multimatic Niche Vehicle Assembly Europe (MNVAE) - part of the Multimatic Niche Vehicle Group. Coventry based, the company assemble hand-built special vehicles and supercars. Being a niche vehicle assembly plant that works on low volume specialist projects, the team needed a modular, flexible solution that could be adapted and changed for different vehicle requirements. In line with their leading standards and expertise, MNVAE chose bott to supply their workspace solution.

Finished in a special ‘signal black’ powder-coat paint, items from the professional, high-quality cubio range were chosen. For the build stations, high-capacity drawer cabinets, toolboxes and cupboards combine with durable lino worktops, creating individual working areas. Robust framework benches provide flexible desk solutions and perfo storage panels with essential accessories, allow for clear and efficient organisation.

“We’re really pleased with the quality of the bott equipment and the overall service from their project team. The delivery and installation were handled with care and expertise, reflecting the exceptional standards of excellence we apply ourselves and the need for a solution that works in a busy environment.” Dan Bryan, Final Assembly Manager at MNVAE.

Ergonomically designed and made in the UK, bott cubio is a comprehensive storage system suitable for the most demanding applications. The range covers drawer cabinets, cupboards, workbenches and mobile storage solutions and can also be integrated with the bott perfo storage system. bott cubio products support higher load capacities, are built to last and benefit from a 10-year extended guarantee.

Community comments

Latest Sponsored News

Ultimate Guide to Getting Your Product Specified in More Projects

Posted 21.11.2024

Getting Your Product Specified in More Projects

We have developed the 'Ultimate Guide to Getting Your Products Specified in More Projects' to provide you with an in-depth understanding of how BIM can unlock product sales and win your more customers. The guide offers insight to BIM and the link to project specification, BIM for business growth, success studies from the industry and a glimpse at the future of BIM.

SuDs – What Schedule 3 Means for You

Posted 19.11.2024

Forterra SuDs Schedule 3

SuDs (Sustainable Drainage Systems) are about to become mandatory in England with the enactment of Schedule 3 of the Flood and Water Management Act 2010. But what does this mean for your next development? In this blog Forterra explains what you need to consider.

Ibstock Are More Than Ready To Play a Leading Role in the Recovery of Building

Posted 14.11.2024

Ibstock Interview with CEO Joe Hudson

With more focus than ever on housebuilding, the team at Ibstock recently had the opportunity of speaking with their CEO, Joe Hudson to discuss how Ibstock are more than ready to play a leading role in the recovery of building.

CloseClose