Silent Gliss: The Silent Revolution

Play VideoPlay Video

Silence just got even quieter with the new Silent Track range.

Resolutely architectural, specially designed tracks married with unique, two-component (2C) gliders, resulting in unprecedented quietness.


As much about both sight as it is sound, the Silent Track sets the new standard for curtain track specifications for architects, interior designers and end-users who aren’t prepared to compromise.

Passion for details - 2-component technology (2C)

The premium 2C gliders and rollers (patent pending), combined with the specially coated tracks allow the curtain to move smoothly and silently. These gliders are manufactured using two materials, a hard component that ensures stability and a soft ‘filling’ to absorb the noise. The end result is unprecedented silence.

The Funnel

A new track design to draw attention in any room. The elegant, funnel-shaped profile is symmetrical in shape so is suited for use as a room divider. The Funnel features the refined ‘click & fit’ mechanism which makes it particularly easy to fit.

Different track designs for different tastes

The systems are available in three sizes (S, M and L), with the track profiles coming in a range of forms – square, oval, rectangular and funnel-shaped. Offered in a range of relevant colours, a functional product is transformed into a design element and adapted seamlessly to any room design.

Click here to download Silent Gliss' Curtain Track Systems Brochure.

Community comments

Latest News

Ultimate Guide to Getting Your Product Specified in More Projects

Posted 21.11.2024

Getting Your Product Specified in More Projects

We have developed the 'Ultimate Guide to Getting Your Products Specified in More Projects' to provide you with an in-depth understanding of how BIM can unlock product sales and win your more customers. The guide offers insight to BIM and the link to project specification, BIM for business growth, success studies from the industry and a glimpse at the future of BIM.

SuDs – What Schedule 3 Means for You

Posted 19.11.2024

Forterra SuDs Schedule 3

SuDs (Sustainable Drainage Systems) are about to become mandatory in England with the enactment of Schedule 3 of the Flood and Water Management Act 2010. But what does this mean for your next development? In this blog Forterra explains what you need to consider.

Ibstock Are More Than Ready To Play a Leading Role in the Recovery of Building

Posted 14.11.2024

Ibstock Interview with CEO Joe Hudson

With more focus than ever on housebuilding, the team at Ibstock recently had the opportunity of speaking with their CEO, Joe Hudson to discuss how Ibstock are more than ready to play a leading role in the recovery of building.

CloseClose