Twinfix: Penketh South Primary’s Brise Soleil

Following on from the launch of our Brise Soleil earlier in the year, we were approached by Aztec to provide some external structures for Penketh South Primary School in Warrington.

With over 30 years of experience, the Twinfix Technical Team had no problems designing structures to suit both their needs and budget.


Our expert team designed, manufactured, and installed a 49 sqm free-standing mono-pitch canopy in the front courtyard of the school and two staircase canopies complete with Brise Soleil.

The Brise Soleil served two purposes, while providing additional shelter in conjunction with the canopies running above the external staircases, it also enhanced the aesthetics of the area and complemented the building’s exterior.

The canopy roofs comprise of our innovative Multi-Link-Panel NF system, the panels conform to the HSE’s recommended drop test for fragility ACR[M]001:2019 with a B designation, meaning they are classified as non-fragile. The Brise Soleil is made up of vertical ellipsoid blades which are 200mm deep and generally 2.1m in height. The aluminium blades were powder-coated in RAL 7035 (light grey) and RAL 3020 (red).

The structures were installed in time to protect students and staff from the recent heatwave and also in preparation for the inclement weather that the new school year will bring.

Community comments

Latest News

Ultimate Guide to Getting Your Product Specified in More Projects

Posted 21.11.2024

Getting Your Product Specified in More Projects

We have developed the 'Ultimate Guide to Getting Your Products Specified in More Projects' to provide you with an in-depth understanding of how BIM can unlock product sales and win your more customers. The guide offers insight to BIM and the link to project specification, BIM for business growth, success studies from the industry and a glimpse at the future of BIM.

SuDs – What Schedule 3 Means for You

Posted 19.11.2024

Forterra SuDs Schedule 3

SuDs (Sustainable Drainage Systems) are about to become mandatory in England with the enactment of Schedule 3 of the Flood and Water Management Act 2010. But what does this mean for your next development? In this blog Forterra explains what you need to consider.

Ibstock Are More Than Ready To Play a Leading Role in the Recovery of Building

Posted 14.11.2024

Ibstock Interview with CEO Joe Hudson

With more focus than ever on housebuilding, the team at Ibstock recently had the opportunity of speaking with their CEO, Joe Hudson to discuss how Ibstock are more than ready to play a leading role in the recovery of building.

CloseClose